[1]
“SCHEDULING OF MULTIPURPOSE BATCH PROCESSES WITH MULTIPLE BATCHES OF THE PRODUCTS”, Hung. J. Ind. Chem., vol. 30, no. 4, pp. 305–312, Oct. 2002, doi: 10.1515/hjic-2002-55.