SCHEDULING OF MULTIPURPOSE BATCH PROCESSES WITH MULTIPLE BATCHES OF THE PRODUCTS. (2002). Hungarian Journal of Industry and Chemistry, 30(4), 305-312. https://doi.org/10.1515/hjic-2002-55